Part 1: Before the inspection
- Note the age of the house and what the roof is made of (concrete tile, terracotta, steel, fibro or unsure).
- List the symptoms: where leaks appear, when (heavy rain, wind direction), any stains, rust or sagging.
- Find any old paperwork about the roof, previous repairs or asbestos tests.
- Check whether a body corporate, estate covenant or heritage listing affects materials or colours.
- Decide if you want gutters, fascia, whirlybirds or skylights considered in the same job.
- If you have solar panels, note the system details for the roofer and electrician.
Part 2: During the inspection
- Did the contractor get on the roof (where safe) and look in the roof space?
- Did they take photos and show you the problems?
- Did they explain whether repair, restoration or replacement fits your roof, and why?
- Did they mention the site's wind classification and coastal exposure?
- Did they raise asbestos if the house is old enough for it?
- Did they ask about access, parking, pets and storage?
Part 3: What the written quote must list
- Contractor's legal name, ABN and QBCC licence number.
- Removal and disposal of the old roof, with asbestos handled separately if present.
- Condition of battens and frame, and how repairs will be priced.
- Batten type and spacing for the new covering.
- Sarking or roof blanket, by product type.
- Roofing material: tile range, or steel profile, colour and coating grade.
- Fixings suited to the site's exposure.
- Ridges, hips, valleys, barges, wall flashings and penetrations.
- Gutters, fascia and downpipes, if included.
- Ventilation such as whirlybirds or ridge vents, if included.
- Scaffold or edge protection.
- Building approval and certifier, if needed, and who arranges it.
- Solar removal and reinstatement by a licensed electrician, if relevant.
- Start date estimate, working days on site and weather allowance.
- Payment schedule and how variations are priced.
- Warranty: what the manufacturer covers and what the contractor covers.
Part 4: Before you sign
- Search the contractor on the QBCC licence register and check the licence class and status.
- Ask for a certificate of currency for public liability insurance.
- Confirm the deposit is within what Queensland rules allow for your contract.
- Read the contract's variation clause and the process for approving extra work.
- Check what happens if weather delays the job.
- Confirm who your day-to-day contact is.
Part 5: During the job
- The house is never left open overnight.
- You are told promptly about hidden damage, with photos and a price before extra work starts.
- Photos are taken of battens, sarking and flashings before they are covered.
- Waste is removed regularly and the site is kept tidy.
Part 6: At handover
- Walk around the finished roof with the contractor (from the ground is fine).
- Gutters and roof are clear of offcuts, screws and swarf.
- Downpipes run freely.
- You have product names and colours for the roof, sarking and flashings.
- You have warranty documents from the manufacturer and the contractor.
- Any approval paperwork and final inspection certificates are with you.
- Solar, aerials and air-conditioning have been reconnected and tested.
Part 7: After the first big rain
- Check the roof space for any water.
- Check ceilings, especially around skylights and walls.
- Report any problem to the contractor in writing, with photos.
Why the checklist matters on the coast
Sunshine Coast roofs face a particular mix of humidity, salt and heavy summer rain. Items on this list that seem minor elsewhere, such as fixings grade, sarking type and gutter capacity, decide whether a new roof here lasts or starts to fail early. A contractor who addresses each one in writing is far more likely to deliver a roof that suits the conditions.
Use it with
Pair this checklist with the step-by-step process, the cost guide and our explainer on roof warranties.
General information for Sunshine Coast property owners, not advice about your particular roof. Rules, products and programs change; confirm with the authority named, or with Sunshine Coast Council or Noosa Shire Council, before acting.